in Operating System edited by
625 views
0 votes
0 votes
Q )Six jobs are waiting to be run. The expected running times are 9, 7, 5, 2, 1 and x respectively. Where 5 < x < 7 and the average completion time is 13. Find the value of x using SJF algorithm? (Assume all jobs arrive at same time = 0).

a)3.33

b)4.33

c)5.33

d)6.33
in Operating System edited by
by
625 views

3 Answers

0 votes
0 votes

x = 6.33

 

The solution is given below:

0 votes
0 votes

Option d is correct .

0 votes
0 votes
  • Option D: 6.33

Related questions