in CO and Architecture retagged by
263 views
0 votes
0 votes
Assume branch instruction occurs 15% of the time and are predicted as not taken, while in practice they are taken 40% of the time with a penalty of 3 cycles. With forwarding, the load delay slot is one cycle and can be filled 60% if the time with useful instructions, 20% of the instructions are loads and 30% of these introduce load delay hazards. What is the new CPI due to load delay slots and branch hazards?

A.  1.204

B. 1.404

C. 2.204

D. 4.404
in CO and Architecture retagged by
by
263 views

1 Answer

0 votes
0 votes
1+0.2*0.3*0.4*1+0.15*0.4*3
=1.024

Related questions