in CO and Architecture retagged by
435 views
0 votes
0 votes

in CO and Architecture retagged by
435 views

1 comment

Option C?
0
0

1 Answer

0 votes
0 votes
Let average clocks for non-pipelined instruction be x

Let each clock takes 1ns

Time to execute one non-pipelined instruction is (3+8+5+6+4) = 26 clocks

and it is given that each instruction takes x clocks, so Time to execute one non-pipelined instruction is 26*x

Time to execute pipelined instruction is 1 clock = 8ns

speedup = Tnon-pipelined / Tpipelined

4 = 26*x/8  => x = 1.23

Related questions